Easy-Going Outdoor Patio Curtains Detachable Tab Top Windproof Weatherproof Curtain for Cabana, Porch, Pergola and Gazebo, Tab Bottom Drape, 2 Panels, 110W x 84L inch, Teal

Easy-Going Outdoor Patio Curtains Detachable Tab Top Windproof Weatherproof Curtain for Cabana, Porch, Pergola and Gazebo, Tab Bottom Drape, 2 Panels, 110W x 84L inch, Teal

$82.48
Sale price  $82.48 Regular price 
Skip to product information
Easy-Going Outdoor Patio Curtains Detachable Tab Top Windproof Weatherproof Curtain for Cabana, Porch, Pergola and Gazebo, Tab Bottom Drape, 2 Panels, 110W x 84L inch, Teal
1/7

Easy-Going Outdoor Patio Curtains Detachable Tab Top Windproof Weatherproof Curtain for Cabana, Porch, Pergola and Gazebo, Tab Bottom Drape, 2 Panels, 110W x 84L inch, Teal

$82.48
Sale price  $82.48 Regular price 
Shipping calculated at checkout.
Description

About This

  • Tab Top & Bottom: Constructed with detachable tab top, which makes the curtains to be moved around and hung with ease. The bottom tabs make the curtain fixed enough that it won't be blown by the wind. It provides protection against rain, snow, heavy wind and other harsh weather element.
  • Multiple Options: Come in a range of colors and sizes to match the decoration of your outdoor space. Each package includes 2 panels of outdoor curtains, each measures width 110 inch by length 84 inch.
  • High Quality Material: 100% polyester fabric with waterproof processing technology, is also able to block out sunlight and UV ray. It is efficient in noise reducing, insulating against heat.
  • Widely Used: Perfect for both indoor and outdoor spaces. These outdoor curtains provide great privacy and safety for your porch, pool, balcony, gazebo, patio pergola, garden, bathroom or indoor rooms.
  • Easy to Care: The curtains are machine washable in cold water, please do not bleach, tumble dry and iron at low temperature.

Overview

  • Brand : Easy-Going
  • Color : Teal
  • Material : Polyester
  • Product Dimensions : 84"L x 110"W
  • Opacity : 85
Care

To maintain the beauty and integrity of your purchase, we recommend treating it with care. Simple maintenance practices, such as gentle washing and proper storage, can effectively preserve the longevity of your favorites. We encourage you to refer to the care instructions included with each item, designed to help you keep your purchase in top condition.

Design

Our dedication to excellence extends beyond materials; it encompasses the artistry and craftsmanship illustrated in every piece we create.

You may also like